Participation offer
Bramsche III, 4.2 MW solar, open to residents
4.25%
Fixed interest p.a.
7 years
Term
€500
Minimum
€2.8M
Volume
The field sits on former grazing land east of the B68. Permits are granted, the grid connection is contracted, construction starts in spring.
Interest is paid annually. The loan is subordinated, which means a total loss is possible, read the information sheet before you sign anything.